Skip to content
Orion Marine
Shore Power · AMP · OPS

Shore Power & AMP Retrofit Services

Engineered to IEC/IEEE/ISO 80005-1, sized to your real berth load and delivered inside your dock window. Shore power is our flagship specialization — and OOCL Montreal is the proof.

Shore power

More than a cable and a socket.

Shore power — Alternative Maritime Power (AMP), onshore power supply (OPS) or cold ironing, depending on who is speaking — lets a vessel stop her auxiliary engines at berth and take electricity from the quay. On the vessel side that means a high-voltage shore connection, a transformer sized to the berth load, a cable management system, and protection, earthing and interlocking that meet IEC/IEEE/ISO 80005-1.

It is a retrofit of the vessel's electrical system, not a cable and a socket. We start from the vessel's switchboard and her real at-berth load, and design the conversion against those rather than against a template. Our guide to what an AMP retrofit involves goes into the scope in more depth.

Scope

What we deliver

From the first survey to a vessel that can plug in.

  • Survey and load measurement

    The existing switchboard, the space available and the real at-berth load, measured before anything is specified.

  • HV shore connection

    The high-voltage shore connection arrangement, designed to IEC/IEEE/ISO 80005-1.

  • Transformer and frequency conversion

    A transformer sized to the berth load, and frequency conversion where vessel and grid differ — on board or ashore.

  • Cable management system

    Cable handling that suits the berths the vessel actually calls at.

  • Protection, earthing and interlocking

    The safety chain that lets the vessel connect and disconnect without risk to people or equipment.

  • Drawings and documentation

    Design drawings and documentation prepared for review by the vessel's class society.

  • Installation

    Installation inside the dock window, sequenced with the rest of the yard's work on the vessel.

  • Testing and commissioning

    Function and insulation tests and commissioning, so the vessel leaves able to plug in.

Terminology

One system, several names

The terms are used interchangeably; the engineering behind them is the same.

  • AMP — Alternative Maritime Power
  • OPS — onshore power supply
  • Cold ironing
  • HVSC — high-voltage shore connection (IEC/IEEE/ISO 80005-1)
  • LVSC — low-voltage shore connection (IEC/IEEE 80005-3)
Vessels

Each vessel type, its own problem

The connection is standard; the engineering problem changes with the ship.

  • Container ships — reefer load at berth
  • Tankers — siting the connection clear of hazardous areas
  • Bulk carriers and general cargo — long berth stays and cargo gear
Project proof

OOCL Montreal: AMP at Sefine Shipyard

In 2026 Orion Marine delivered the AMP and marine-electrical scope on the 4,402 TEU container ship OOCL Montreal, during a combined yard period at Sefine Shipyard. The work ran to the yard's dock schedule, and the vessel left commissioned — able to shut down her auxiliary engines wherever a quay offers the connection.

Read the case study
How it runs

From survey to plug-in

The schedule is planned backwards from the dock date.

  1. 01

    Survey

    Survey and load measurement

    The switchboard, the available space and the at-berth load are surveyed on board.

  2. 02

    Engineer

    Engineering and documentation

    The connection is designed to 80005-1, drawings go for class review, and long-lead items are ordered against the dock date.

  3. 03

    Deliver

    Installation and commissioning

    The system is installed in the dock window, tested and commissioned, ready to connect.

Shore power guides

Further reading on shore power

Shore power

AMP Shore Power Retrofit: What the Scope Involves

Owners often price a shore power conversion as a cable and a socket. Here is the scope that decides whether the vessel can actually plug in.

6 min read

Regulation

The 2030 Shore Power Deadlines: FuelEU Maritime and AFIR

Two EU regulations set 2030 as the year shore power stops being optional for containerships and passenger ships. Here is what each one actually requires, and why 2030 is not the date that should drive your planning.

5 min read

Global

Shore Power Retrofits Worldwide: AMP, Standards and Rules

Alternative Maritime Power lets ships shut down auxiliaries at berth. A worldwide guide to the 80005 standard, the rules from the EU to China, and the retrofit itself.

9 min read

Container ships

Shore Power for Container Ships: The Reefer-Load Problem

Container ships face the EU's earliest at-berth shore power deadline and the hardest load to size — the reefer engineering and high-voltage connection scope.

8 min read

Tankers

Shore Power for Tankers: A Hazardous-Area Problem

On a tanker the shore-power connection lives next to cargo and vent zones. Hazardous-area engineering, not the cable, is what makes the retrofit safe and approvable.

9 min read

Bulk carriers

Shore Power for Bulk Carriers: The Retrofit Scope

Bulk carriers sit at berth for days with cranes and conveyors running. That long dwell makes them strong shore-power candidates and shapes the retrofit.

9 min read

FAQ

Questions about shore power

What is the difference between AMP, OPS and cold ironing?
They are names for the same thing: supplying a vessel at berth from the shore grid, so that her auxiliary engines can be stopped. AMP is common in container shipping, OPS is the term used in EU regulation, and cold ironing is the older, informal name.
Which standard applies to a shore connection?
High-voltage shore connections are covered by IEC/IEEE/ISO 80005-1, and low-voltage connections by IEC/IEEE 80005-3.
When do vessels need shore power?
In the EU, FuelEU Maritime and AFIR require container and passenger ships to connect at berth in core ports from 2030, and other regions have their own rules. Our guide to the 2030 deadlines explains who is affected.
How long does a shore power retrofit take?
It depends on the vessel and on what can be prepared before the docking. Long-lead items such as transformers have to be ordered against the dock date, so we plan the schedule backwards from it during scoping.

Ready to plug in at berth?

Send us the vessel and the dock window you're working towards. We'll scope the conversion against her real berth load.