Marine Electrical Retrofit & Modernization
Spares that no longer exist, faults that keep coming back, a plant asked to carry more, a regulation date. We engineer the change around what stays on board, then cut over, test and commission in the time the vessel can stop.
When repair stops being the answer
Most retrofits start with one of these.
- 01
Spares are no longer made
Breakers, protection relays, PLCs or drives the maker has discontinued. The next failure means a long wait or a second-hand part of unknown history.
- 02
The same fault keeps returning
A repair holds for a voyage or two, then the trip or the alarm is back. Age, heat and vibration have reached the system itself, not one component.
- 03
The plant has to carry more
New consumers have used up the spare ways on the switchboard, or the generators no longer have the margin to start a large motor.
- 04
Controls nobody can support
Automation or power management hardware with no software backup, no spares and nobody left who knows the program.
- 05
A regulation date is coming
Shore power at berth in ports covered by Article 9 of AFIR from 2030 under FuelEU Maritime, and similar rules elsewhere.
One change touches the rest of the system
When an obsolete drive is replaced, the job is not only the drive. The new unit has to suit the existing motor: modern inverter switching can stress older insulation and contribute to bearing currents, and cable length matters. The start, stop, speed-reference and feedback signals have to match what the automation sends and expects. Switchboard protection is checked for the new unit, harmonic impact is considered, and the drive is tested in the operating modes required by the vessel.
A switchboard upgrade is checked against fault level, protection selectivity, physical fit, heat load and access. New breakers have to suit the prospective fault current at that board, and the protection has to remain selective so a fault is cleared as close to its source as practicable. We survey the existing installation against its drawings before specifying the change, because the as-fitted arrangement may differ from the record. Where the work is new equipment rather than a change to the existing system, it is planned as an installation.
What we modernize
One system or several, in the same stop.
Drives and motors
Obsolete VFDs replaced, direct-on-line starters converted to drives, and motors replaced where the old one cannot take the new duty.
Switchboard upgrades
New sections, breakers and protection relays on main and emergency switchboards, rated for the fault level.
Distribution modifications
Distribution boards, feeders and transformers reworked when loads change or capacity runs out.
Automation and control
Control, alarm and power management hardware replaced, with the signals and logic carried over and tested.
Obsolete components
Breakers, relays, contactors and controllers that can no longer be supported, replaced with compatible current equipment.
Shore power integration
A high-voltage shore connection added to the existing switchboard: the AMP retrofit.
Planning the cut-over
The time the vessel is out of service is set by the cut-over, so that is what the job is planned around.
- 01
Survey
The existing installation
Switchboards, loads, drawings and spare capacity are checked on board, and the as-fitted state is recorded.
- 02
Prepare
Work before the stop
Long-lead equipment is ordered against the stop date, and cable routes and pre-wiring are done while the vessel still trades where that is possible.
- 03
Cut over
Change, test, commission
Old equipment out, new equipment connected, tested and commissioned in the planned window, and the drawings updated to match.
Shore power: the retrofit with a deadline
A shore connection can change the vessel's single-line diagram. Depending on the arrangement, the retrofit can involve a new incoming supply to the main switchboard, protection and interlocking with the generator breakers, a transformer and a cable-management system. On OOCL Montreal, a 4,402 TEU container ship, Orion Marine delivered the AMP scope at Sefine Shipyard in 2026 within the yard period.
Read the OOCL Montreal case studyRelated services and guides
- Shore Power / AMPShore power (AMP / OPS) retrofits: load survey, HV shore connection to IEC/IEEE 80005-1, transformer, cable management, installation and commissioning.
- Installation & OutfittingElectrical installation on vessels in service: new equipment, cabling and transits, switchboard connections, motors, drives and controls, then commissioning.
- Repair & TroubleshootingShip electrical fault finding and repair: tripping breakers, load-sharing problems, drive faults, earth faults and control failures, traced by measurement.
- Marine Electrical ServicesMarine electrical engineering, installation, retrofit, repair and shore power for vessels in service — in shipyards, ports, on board and offshore.
Questions about retrofits
- How long does the vessel need to stop?
- Only as long as the cut-over. Preparation that does not need systems dead is done beforehand, on board or alongside; the stop covers disconnection, connection, testing and commissioning.
- Can a retrofit be done in stages?
- Often, yes. A switchboard or an automation system can be changed section by section, so the vessel keeps working on the parts that have not been touched yet.
- Will a retrofit need class approval?
- A change to the single-line diagram, to essential services or to protection usually does. The drawings go to the vessel's class society ahead of the work, so the approval time is built into the schedule.