Marine Electrical Installation & Outfitting

New equipment on a vessel that is already built and already live. We route the cables, connect into the switchboard, bring the controls into the automation and commission the result before handover.

When it comes up

Installation on a vessel in service

Installation work on a trading vessel usually arrives in one of these forms.

  1. 01

    Equipment added in a yard period

    A new pump, compressor, fan, treatment plant or deck machine needs a supply, a starter or drive, a cable route and control connections, finished before undocking.

  2. 02

    A replacement that is not like-for-like

    A new motor or drive with different ratings means the cable size, the breaker, the protection settings and the starter all have to be checked again, not only the terminals.

  3. 03

    More distribution capacity

    A new distribution board, extra feeders or a transformer, with the outgoing ways sized and protected for the loads they will carry.

  4. 04

    Connections into the automation

    Equipment that has to report alarms, be started and stopped remotely or run under the power management system needs I/O, signal cabling and changes in the control system.

  5. 05

    Shore connection hardware

    The shore connection panel, cable management system and transformer of an AMP conversion. The engineering behind them is on the shore power page.

Scope

What we install and connect

Typical work packages; each job is scoped to the vessel.

  • Cabling and transits

    Power, control and signal cables routed, pulled, glanded and terminated, power and signal kept segregated, and bulkhead and deck transits used or added without breaking their fire or watertight rating.

  • Switchboard connections

    New outgoing circuits connected into the main, emergency or distribution switchboards, with breaker and protection settings to suit the load.

  • Motors and starters

    Motors connected and rotation-checked once the mechanical trade has mounted them; direct-on-line, star-delta or soft starters as specified.

  • Drives

    Variable frequency drives installed with the screened cabling, earthing and cooling they need, and set up for the load they run.

  • Control system integration

    I/O, signal cabling and interface changes so the new equipment appears in the alarm, monitoring and control system.

  • Power distribution modifications

    Distribution boards, transformers and feeders added or rearranged to supply the new loads.

Integration

Working inside an existing vessel

A vessel in service was not built around the new equipment. Cable trays are already full, transits have limited space, and the switchboard the new circuit lands on is carrying load for the rest of the ship. Before any material is ordered we check the connection point: spare ways, the breaker rating against the fault level there, the cable size for the load and the length of run, and the route the cable will actually take.

On site, the work is sequenced with the other trades and the vessel's operation. Isolations are planned so unaffected parts of the plant can stay live where the system allows, hot work stays within the permit, and work that needs a dead switchboard goes into a suitable port stay or docking. The job is closed out by testing and commissioning. When the job changes an existing system rather than adding new equipment, we plan it as a retrofit.

Testing & commissioning

How an installation is proven

An installation is finished when it has run under load, not when the last cable is terminated.

  1. 01

    Pre-energisation

    Checks before power goes on

    Insulation resistance and continuity on every new cable, terminations and earthing checked, protection settings entered and verified.

  2. 02

    Energise

    Controlled energisation

    Circuits energised one at a time, voltages and phase rotation confirmed, protection and interlocks function-tested.

  3. 03

    Commission

    Running under load

    The equipment run with the system it serves, alarms and remote controls proven, results recorded and drawings marked up for the vessel.

FAQ

Questions before an installation

Can installation work be done while the vessel is trading?
Much of it, yes. Cable pulling, pre-wiring and work that does not need systems shut down can be done on board or alongside; anything that needs a dead switchboard or hot work near live plant is planned into a port stay or a docking. We plan the split during the survey.
Who provides the equipment?
Either the owner or us. Owner-supplied equipment is checked against the design before it is installed; where we source it, it is part of the electrical scope we are responsible for.
Will the new equipment need class approval?
If it changes the single-line diagram or adds an essential consumer, usually yes. We prepare the electrical drawings for submission and tell you early if approval sits on the critical path.

Planning an installation?

Send the vessel, the equipment and the yard or port dates. We'll check the connection points and come back with a scope you can plan around.