Marine Electrical Riding Team
Some electrical work does not need the vessel stopped; it needs enough time on board before the shutdown-dependent stage. A riding team can use a passage for surveys, cable pulling and preparation, leaving the next port stay or docking for connections, isolation and final testing.
Why put electricians on board for a passage?
A retrofit or large installation contains work with different isolation needs. A switchboard connection, drive change or final test may need a system released; tracing what is fitted, pulling cable, mounting supports and pre-wiring often do not. Moving suitable preparation into the passage can reduce how much is left for the port or docking window.
A riding team can also help with faults that do not appear alongside. Some alarms and trips occur only under sea-going load, in weather or after hours of running; having the engineer and instruments on board can make those conditions observable. Whether that justifies a passage depends on the fault and the voyage.
Work a riding team can do at sea
Each task is agreed with the chief engineer and performed under the vessel's permit-to-work, only when the relevant equipment can be released without compromising essential services.
Surveys and as-fitted tracing
Switchboards, cable routes and equipment checked against the drawings, so the engineering starts from what is actually fitted.
Cable pulling and routing
New cables are pulled along their route and secured, ready to terminate when the connection point can be isolated.
Equipment mounting and cable supports
Panels, junction boxes and cable supports can be fitted where the work is suitable for the passage. Any hot work required for supports remains subject to the vessel's permit system and operating restrictions.
Pre-wiring
New panels and distribution boards can be pre-wired and checked before connection, reducing the work left for the final isolation window.
Control and alarm preparation
I/O allocated, signal cables run and terminated at the field end, and the signal list ready for testing once the control system can be worked on.
Non-essential consumers
Where a consumer can be isolated without affecting vessel safety or essential operation, selected starter, cable or fitting work can be carried out during the passage.
From survey to commissioning, and where each step happens
A staged electrical job can be split into five decisions. The key question is which steps are suitable for the passage and which need a port or docking window.
- 01
At sea
Survey and preparation
Tracing, measurements, cable pulling and pre-wiring, with nothing essential isolated.
- 02
Decided before sailing
Isolation requirement
For each connection: which section or consumer must be dead, for how long, and whether the vessel can spare it at sea.
- 03
At sea or in port
Installation and connection
Work on non-essential consumers may be possible at sea when the required isolation is available; work inside a switchboard section is normally reserved for a port stay or the docking.
- 04
Dead, then live
Testing
Insulation and continuity tests with the circuit dead, then function tests once it can be energised.
- 05
With the system running
Commissioning
The equipment is run with the system it serves, under real load. Some functions can only be proven alongside or under way.
Working at sea does not mean working on live equipment. Every connection is made with the circuit isolated and proven dead under the vessel's permit-to-work, and anything that needs an essential service off the board waits for a window where the vessel can spare it.
Arranged before anyone joins
A riding team means additional people on board for the passage. Accommodation, joining and leaving arrangements, and work controls have to be agreed before they join.
- Accommodation and life-saving appliance capacity for the additional persons on board
- The joining port and the leaving port
- Travel documents for both ports
- Familiarisation on board and the vessel's permit-to-work
- Materials, tools and test instruments loaded before departure
- Whether class review or attendance is required for the planned work
Decided before we mobilise
The passage work list needs to be fixed before departure so the team joins with the required materials, tools, drawings and test equipment.
- The work list for the passage, item by item
- Which isolations the chief engineer can allow at sea
- What waits for the next port stay or the docking
- Drawings and as-fitted records to bring
- Who on board our team reports to
Where the prepared work is finished
- Retrofit & ModernizationShip electrical retrofits: obsolete drives and switchboard parts replaced, distribution and controls modernised, shore power integrated into the existing plant.
- Installation & OutfittingElectrical installation on vessels in service: new equipment, cabling and transits, switchboard connections, motors, drives and controls, then commissioning.
- Shipyard & DockingElectrical work planned into a docking: switchboard sections, feeders, transformers, drives and shore power, sequenced with the yard programme.
Questions about riding teams
- Does working at sea mean working on live equipment?
- No. Equipment is isolated and proven dead before we work on it, just as it would be in port. What sailing changes is which systems the vessel can spare, so isolation-dependent work is planned for when she can.
- Will a riding team shorten the docking?
- It can, when a large part of the electrical scope is preparation that does not need the vessel stopped. If most of the work requires a dead switchboard section, there may be little to gain by moving a team on board early.
- How long does the passage need to be?
- There is no fixed minimum. The passage needs enough time for joining, familiarisation and the agreed work; anything that does not fit moves to a later passage, port stay or docking window.
- Can you attend a vessel working offshore?
- Yes, for electrical work on the vessel itself, subject to the operator's transfer and personnel requirements. Any required offshore training or transfer arrangements are defined by the operator and confirmed before mobilisation. Orion does not take on platform, wind-farm or other offshore-installation electrical work.
Can part of the electrical work be moved into the passage?
Send the vessel, the route and dates, and the work you want prepared or finished. We'll tell you what can be done at sea and what has to wait for port or docking.