Skip to content
Orion Marine
Marine Electrical

Marine Electrical Work During Shipyard and Docking

A docking can provide isolation, access and lifting windows that are difficult to create while the vessel is trading. Main-switchboard work, long cable runs and heavy equipment changes can then be planned as one electrical package around the yard programme.

The docking package

Electrical jobs that belong in the docking

These are jobs that usually need a longer isolation window, yard access or lifting support. Surveys, cable preparation and other non-shutdown work can often be moved earlier to port or passage.

  1. 01

    Main switchboard sections and busbar work

    New sections, busbar extensions and incomer changes can require the board, or a large part of it, to be isolated. A docking creates a planned window for that work and the subsequent tests. The engineering is on switchboards and power distribution.

  2. 02

    Supplies for other yard packages

    Equipment fitted by the yard or another contractor, such as a ballast water treatment system, a pump or a deck machine, needs a supply, a starter or drive and control connections, ready before that package is commissioned.

  3. 03

    Transformer installation

    A transformer may need a lifting route, foundation work by the yard and access that is easiest during docking. We plan its electrical connection, protection and test sequence around the lift and installation dates.

  4. 04

    Long cable runs

    Long cable runs are easier when the yard has opened normally inaccessible spaces for other work. The route, supports and pulling sequence are coordinated with that access.

  5. 05

    Obsolete drives and starters on essential services

    For an essential service, replacing an obsolete drive or starter may require a planned outage that is difficult to create in operation. The engineering is on retrofit.

  6. 06

    Shore power retrofit

    The ship-side shore connection, from the incoming breaker to the cable management system, with the main switchboard tie-in made while the board is dead. See shore power and AMP.

  7. 07

    Automation and alarm integration

    Where new equipment interfaces with the vessel's alarm, control or power-management systems, those signals and interlocks have to be integrated and tested before handover. They should not be left as unresolved commissioning work for the voyage.

The yard programme

Our package inside the yard's programme

The yard runs the docking. Its programme sets when the vessel enters and leaves the dock, when her generators stop and the yard supply is connected, and when each package has access to its spaces. Our electrical package is one of several, and it is planned to that programme from the start, not fitted around it later.

Isolation windows are one of the first dependencies to agree. During a yard period, temporary or yard power may still be supporting lighting, ventilation and contractor loads while sections of the vessel's distribution are out of service. The plan therefore needs to define which sections are dead, on which dates, and how the remaining required loads stay supplied.

Equipment lead times and class review have their own dates. Transformers, switchboard sections and drives have to be scheduled against the dock date, and drawings go to the vessel's class society before installation where class requires it. Commissioning is planned back from undocking: dead tests during the dock period, energisation once the board is back, and load tests when the generators can run. Functions that can only be proven under way are listed for the sea trial.

Before the dock date

From work list to undocking

Most of the work on a docking is decided, and much of it prepared, before the vessel reaches the yard.

  1. 01

    Work list

    Electrical items in the specification

    We help you list the electrical jobs, separate those that need the dock from those that do not, and describe each well enough for the yard and the other contractors to plan around.

  2. 02

    Survey

    On board before docking

    As-fitted condition checked against the drawings, connection points and cable routes confirmed, and drawings prepared for class review where needed.

  3. 03

    Prepare

    Before the dock date

    Long-lead equipment scheduled against the dock date, cables and panels prepared, and work that does not need the dock completed in port or on passage.

  4. 04

    In dock

    Isolation, installation, dead tests

    Old equipment out and new equipment connected inside the agreed isolation windows, with insulation and continuity tested before anything is energised.

  5. 05

    Before undocking

    Energise, prove, hand over

    Circuits energised in a controlled order, functions and interlocks proven, load tests run when the generators are back, and the drawings updated for the vessel.

Project proof

OOCL Montreal: the AMP scope inside a combined yard period

In 2026 Orion Marine delivered the ship-side AMP electrical scope on OOCL Montreal, a 4,402 TEU container ship, at Sefine Shipyard in Türkiye. The work was carried out within a yard period that also included docking and propulsion-efficiency work, and the vessel left with the shore connection commissioned. This is Orion's documented reference for ship-side shore power delivered within a yard period.

Read the OOCL Montreal case study
For the enquiry

Send with the docking enquiry

The earlier these are available, the more of the electrical package can be engineered and prepared before the vessel enters dock.

  • Vessel name, the yard and the dock dates
  • The electrical items on the work list
  • Single-line diagram and the affected drawings
  • Equipment already ordered, and its delivery dates
  • Other packages that need power or control connections
  • Class requirements that affect the electrical work
Scope

What stays with the yard and other contractors

We deliver the electrical package. These stay with others, and we plan our work around theirs.

  • Docking, undocking and the dock programme
  • Hull, structural and steel work
  • Mechanical installation and overhaul
  • Blasting, painting and tank work
  • Overall planning of the docking
FAQ

Questions before a docking

How early should we involve you?
Before the docking specification goes out to the yards, if you can. Long-lead equipment is ordered against the dock date, and the drawings may need class review before installation. Starting late usually means fewer items fit the docking.
How does Orion fit into the yard contract?
The contracting route depends on the project. What matters for Orion's scope is that the electrical package, interfaces and dates are defined against the yard programme; our responsibility remains the electrical work.
Can some of the docking work be done before the vessel arrives?
Often, yes. Surveys, cable pulling and pre-wiring can sometimes be done in port or by a riding team on passage, so the docking window can focus on shutdown-dependent work.
Who deals with class?
The owner or vessel remains responsible for class engagement. We prepare the electrical drawings and test records for our scope and support class review or witnessed testing where required.

Electrical work in your next docking?

Send the vessel, the yard and dock dates and your electrical work list. We'll tell you what needs the dock, what can be done before it and what we need from the yard.